The Reef At King’s Dock To Open For Preview This Saturday
Mapletree Investments plus Keppel Land are readied to open up for preview an all new deluxe waterside plan– The Reef at King’s Dock– 16 January, with observations firmly by scheduled time only.
Reasonably situated within the HarbourFront as well as Keppel Bay areas, the development is within the Greater Southern Waterfront, “which the govt plans to modify in to a brand new key gateway intended for urban living around Singapore’s southern coast”, stated the developers.
Predicted to get finalized by 2025, The Reef at King’s Dock will include ten home blocks comprising 429 apartments of one to three rooms residences with specifications stretching within 431 square foot and hundred and forty six square meter.
Rates for the single bed room will begin with roughly $960,000, $1,600,000 for the two-bedders and $2,800,000 to get the three bedders.
Services at the project involve a gym, roof terrace, tennis court, multi-purpose spaces plus kid’s entertainment zone.
It will also furnish “Singapore’s initial drifting deck in a housing development, positioned in the waters of King’s Dock”.
The 180 metres floating deck will place an Olympic-length pool, a rejuvenation pool plus a relaxation swimming pool. It will similarly offer an aquatic watching spot where residents and guests are able to view the marine conservation within King’s Dock.
“We rejoice to come together with a like-minded partner just like Mapletree to inspire a top notch new condominium to the first-rate Keppel Bay waterfront district. The Reef at King’s Dock was considerately also freshly produced to mutually incorporate the wild along with metropolitan surroundings, by having the purpose of generating a resort-style project that homeowners would definitely eagerly anticipate coming home to on a daily basis,” pointed out Ng Ooi Hooi, President (SG also Territorial Investments), Keppel Land.
The transactions showroom for The Reef at King’s Dock is discovered on the end of HarbourFront Ave.
Reservations are going to begin with 30Jan ’21, once the plan is kicked off.